Installation and maintenance of cable machine
Release time:
2021-06-16
Before installing the cable crane, please refer to the size of the foundation drawing, lay the foundation and anchor screw holes, and install them after the foundation solidifies (the anchor holes of each component shall be positioned according to the actual size) and then fix them with cement. First, two standard points are determined on the basis, and an ink line is ejected from the ink fountain to draw the center line of the machine. Then, according to the size and position of the drawing, the gear box of the main machine, the support seat, the intelligent steel strand, the paper wrapping head, the steel wrapping head, the traction wheel and other components are arranged in an orderly manner.
InstallationCable-forming machineBefore, please refer to the size of the foundation drawing, lay out the foundation and anchor screw holes, and install them after the foundation solidifies (the anchor holes of each component shall be positioned according to the actual size) and then fix them with cement. First, two standard points are determined on the basis, and an ink line is ejected from the ink fountain to draw the center line of the machine. Then, according to the size and position of the drawing, the gear box of the main machine, the support seat, the intelligent steel strand, the paper wrapping head, the steel wrapping head, the traction wheel and other components are arranged in an orderly manner.
At the same time, two one-meter-high datum points are set at both ends of the ink line of the cable-forming machine, and a thin line is tightened to pass through the hollow shaft on the same axis. Then install the main engine gearbox, torsion cage, winding head, steel belt head, universal coupling and grade 27 gearbox.
Cable-forming machineEach unit adopts local lubrication. 30-40 oil should be filled in the gear reduction box, and the oil level should be observed from the oil hole frequently, and the oil in the box should be replaced. Calcium-based grease shall be added to the bearings of each transmission shaft, and lubricating oil shall be added to the box. The lifting worm gear box has been in production for 1000 hours. Each gear box is cleaned and replaced with new oil every 12 months. There are relative moving parts (chute, screw rod, open gear pair, etc.), which are refueled once per shift before production and lubricate the grease once a year.
Cable-forming machineCheck the oil level of the gearbox once a month. If the oil level is lower than the oil line, add new oil. Before each shift, check that the fastening screws of the wireframe gland are loose and tightened. One month after the production of the cable machine, check whether the feet and screws are loose. Once it is found to be fastened in time, whether the moving parts are abnormal, and whether the winch cage runs smoothly, check and adjust the support wheels to ensure the operation of the winch cage.
The above is a small series of this introduction, I hope to help you.
?
TAG:
Recommend News
Let's learn about the bow winch machine.
2024-04-07
The important role of the bow winch machine
2024-03-27
HEXING CABLE MACHINERY
TEL: +86-317-3601666, +86-317-3236119
FAX: +86-317-3618408
E-MAIL: china@hbhxdg.cn
E-MAIL: hbhxdg@gmail.com
WEB: http://www.hbhxdg.cn
ADD: Baoantun Industrial Zone, Hejian City, Hebei Province